WELCOME TO CATCON

CATCON is a resource based, professional, innovative, market focused civil engineering construction company providing professional services to national and international clients within all regions of Australia.

CATCON has extensive experience in the delivery and project management of major power, mining, water and general infrastructure projects.

The combined skills of CATCON’s professional and field resources, together with CATCON’s desire and capability to incorporate the latest developments in safety, quality, environmental management and innovative design leads us to believe that we can provide the highest level of cost effectiveness and client satisfaction within the construction industry today.

Safety

RECENT PROJECTS

Erection and WTG's

Woodlawn Wind Farm

The Woodlawn Wind Farm project involved the Design and construction of Wind Turbine Generator (WTG’s) gravity and rock anchor foundations, access roads and adjoining crane hardstands for the 23 WTG wind farm located in New South Wales. Transformer kiosks were supplied and installed as precast items rather than conventional wet pours. Ancillary features constructed concurrently were stair plinths,...[more]

Aerial View

Dry Creek Rail Yard Relocation

The Dry Creek Rail Yard Relocation involved the construction of new metro rail yards in the inner Northern suburbs of Adelaide. CATCON completed civil works including; earthworks, pavements, handling processing and disposal of contaminated fill materials, piling for future electrification, piling works for lighting, Dry Common Services (DCS) including Signalling, electrical and communication...[more]

Gunning Wind Farm Turbines

Gunning Wind Farm

CATCON was contracted to construct 31 Wind Turbine Generator (WTG) foundations, access roads and adjoining crane hardstands. Ancillary features associated with such were concrete drainage pipes/headwalls, cattle grids, access gates and final rehabilitation (seeding). Works also included the installation of High Voltage (HV) and Optic Fibre Reticulation cabling, in line joints, terminations within WTG’s...[more]

Aerial View

Aldinga Waste Water Treatment Plant

The Aldinga Waste Water Treatment ‘B’ Plant project was located approximately 40km South of Adelaide. The ‘B’ Plant expansion works included 2300m3 of Structural Concrete constructing; Inlet Structure, 2 x Clarifiers, Oxidization Ditch, Chem Dosing and Daft Plants, Chlorine Contact System, RAS/WAS System and various other structures. 30,000m3 Bulk Earthworks included pond construction...[more]

Completed Turbines

Collgar Wind Farm

The Collgar Wind Farm scope of works for CATCON included the Geotechnical investigation, design and construction of 111 concrete wind turbine foundations and a 74 km road and hardstand network. The scope also included construction and maintenance of the project offices and amenities and all satellite facilities for 200 people. The Collgar site is located 300kms east of Perth in the middle of the WA...[more]

Site Overview

Sino Iron Power Station

Located approximately 80km South of Karratha (WA) in Cape Preston, CATCON was proud to be involved in the Sino Iron Power Station Project. The project involved civil works for a 420MW power station comprising of; seven gas turbines, three steam turbines and all associated structures. Civil works also include electrical conduits and pits. Concrete structures were constructed using a combination of form...[more]

Completed Turbines

Waterloo Wind Farm

The Waterloo Wind Farm is located 120kms North of Adelaide, South Australia. CATCON were contracted to design & construct 37 V90 Turbine footings, hardstands, roads, sub-station and control buildings. The terrain comprised of steep and narrow ridges and rock strata which required blasting and a host of machinery including; D9 Dozers, 80t Excavator, 30tn Excavators, 30tn Dump Trucks, 50tn Cranes,...[more]

Condamine Power Station

Condamine Power Station

CATCON were contracted to supply in-ground structures for all associated plant for the 2 x coal seam gas fired turbines. Additionally all in-ground services provision were supplied and installed by CATCON. System formwork was used for all Gas Turbine Blocks, Steam Turbine Block, HRSG and Diverters. Conventional formwork used for cooling tower, transformer bays, pits and ancillary skids and...[more]

Quarantine Power Station

The 120MW Quarantine Gas turbine project is located on Torrens Island (SA) approximately 20kms North West of the Adelaide CBD. CATCON were contracted to supply the civil works package including; piling, detailed excavation, concrete works, precast concrete panel construction, electrical infrastructure, conduits, pit lids earthing, boring for earth stakes,  stormwater drainage works, plant waste water...[more]


CAPABILITY